Advertising space purchasing interface

Drag
Your advertising space orders
Advertising rates
×

Loading...

Media Kit
×

Loading...

General Conditions of Sale
×

Loading...

Congo – Electricity
– Improving the rate of access to electricity

Position

Reference

Space not available

Reserve this advertising space

The file format is not recognized

Click here for
upload an ad

Click here to download
an announcement

Here drag and drop or
upload an ad

Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media

Reserved space
Announcement transmitted

If you want another location, you can move this ad

Reference

Congo – Electricity
– Improving the rate of access to electricity

dav

Until now, electricity was supplied by gas-fired power plants and dams. Hydroelectric. Thanks to the energy mix, Congo aims to achieve an electricity access rate of 50% in urban and rural communities by 2030.

Position

Reference

Space not available

Reserve this advertising space

The file format is not recognized

Click here for
upload an ad

Click here to download
an announcement

Here drag and drop or
upload an ad

Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media

Reserved space
Announcement transmitted

If you want another location, you can move this ad

Reference

In terms of electricity production infrastructure, Congo can rely on the Côte Matève (300 MW) and Djeno (50 MW) gas-fired power plants, as well as thermal power plants for Brazzaville and the departmental capitals. The Imboulou hydroelectric power plant (120 MW) and the Liouesso hydroelectric power plant, with a capacity of 19 MW, have been commissioned, and the Moukoukoulou hydroelectric power plant (74 MW) has been rehabilitated. With the commissioning in 2022 of the new Pointe-Noire gas turbine, with a capacity of 170 MW, the energy production of the Congo Power Plant reaches 484 MW, thus supplying more than 2 million households. The total electrical power of the Congo is now 650 MW for an electrical demand of 600 MW. Increasing the capacity of the Congo Power Plant will undoubtedly contribute to improving energy supply and reducing power outages in the country's two main cities. In 2015, the electricity transmission lines stretched over 1,500 kilometers, whereas in 2002, these lines were only 700 kilometers long. The network has therefore more than doubled.

Position

Reference

Space not available

Reserve this advertising space

The file format is not recognized

Click here for
upload an ad

Click here to download
an announcement

Here drag and drop or
upload an ad

Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media

Reserved space
Announcement transmitted

If you want another location, you can move this ad

Reference

However, the electrification rate in rural areas remains very low, at less than 10,000 km3, according to official sources, while in urban areas, the electrification rate is estimated at 47,000 km3. The electrification of rural communities is among the government's priorities. To complete the Energy Boulevard, the government has set itself the challenge of resolving the issue of the transmission and distribution of available energy. Indeed, energy is not consumed at production sites; it must be transported to transformation points, and once transformed, the energy must be distributed. However, the distribution network is extremely fragile. Secondary transformer stations, like medium- and low-voltage lines, are dilapidated. This situation explains the recurring power outages. Another area of expected progress: the extension of energy transmission to the outlying areas of large cities. 

Position

Reference

Space not available

Reserve this advertising space

The file format is not recognized

Click here for
upload an ad

Click here to download
an announcement

Here drag and drop or
upload an ad

Send the ad up to 8 days after payment
A link will be sent to you by contact@via-agency.media

Reserved space
Announcement transmitted

If you want another location, you can move this ad

Reference